![]() ![]() I challenge myself to create the safest workable plan that reduces the total number of lifts while reducing the total equipment rental cost and the schedule to complete the project. I approach each project looking for the best option based on our construction plan. The installation of each tower crane will require a foundation to be installed which leads to additional cost. Using this method would require the monorail systems to be stick built at a 130’ elevation on top of each of the units outlet duct.īased on the use of the two tower cranes it will require a 12 month rental schedule for each of these cranes to complete the work. This monorail system will be used to service the SO3 nozzles that are being installed into the outlet duct.ĭuring the bidding process the proposed method of erection was to use two tower cranes one located at the decommissioned stack north of unit five and the second one located at the decommissioned stack between unit one and two. The purpose of this project is to install a monorail system on top of the outlet duct on Units 1, 2, 3, 4, and 5. Voting ends March 15th! SO3 Monorail by Steve Phillips, Sterling Boiler and Mechanical
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |